Energy News  
Smart-1 First Birthday In Space And Second Lunar Resonance

On 14 August, AMIE was pointed back at Earth and took this image showing southwest Europe, west Africa, North America and South America. At the time the image was taken, Smart-1 was 200 000 kilometres from Earth and the Earth filled AMIE's field of view. Photo credit: ESA

Paris, France (ESA) Oct 05, 2004
On 27 September 2004, Smart-1 celebrated its first birthday in space. After travelling about 78 million kilometres, the spacecraft is in good health with all subsystems functioning as expected.

As anticipated, Smart-1 has had its second encounter with the Moon. The event took place 15 September at 01:07 UTC, when Smart-1 was at apogee, and about 280 000 km from the Earth. As was the case with the first lunar resonance, the Moon's gravity has substantially altered the Smart-1 orbit.

Up to 1 October, at the 278th engine pulse, the Smart-1 electric propulsion system has cumulated a total ON time of nearly 3440 hours, consumed about 54 kg of Xenon and imparted to the spacecraft a velocity increment of about 2570 ms-1.

On 14 August, AMIE was pointed back at Earth and took this image showing southwest Europe, west Africa, North America and South America. At the time the image was taken, Smart-1 was 200 000 kilometres from Earth and the Earth filled AMIE's field of view.

On 27 September an attempt was made to monitor X-rays from an Earth aurora with D-CXIS, starting at 02:17:00 UTC. The experiment lasted a little over three and half hours. The detectors of DCIXS were oriented in such a way that they could monitor both magnetic poles of the Earth at the same time in case an aurora would occur over one of them. The data were downloaded to Earth and the D-CIXS team at Rutherford Appleton Laboratory in the UK is presently processing them.

Also on 27 September a Laser Link experiment was performed to study the laser beam propagation through the atmosphere and space. A laser was switched on from the Optical Ground Station in Tenerife and the spacecraft performed parallel scans of 1.325 degrees.

At the same time AMIE took images to allow the team to observe the line produced by the laser hit while the spacecraft was slowly moving (0.013 degrees per second and later 0.026 degrees per second).

The third resonance and last encounter before the lunar capture will take place on 12 October, when the orbital period of Smart-1 and the Moon will be at a 1:3 ratio. The last time Smart-1 will approach the Earth, the last perigee, will be on 2 November. Finally, the last part of the Earth orbit will lead to the capture by the Moon and the first perilune on 15 November.

Between 1 October and arrival at the Moon, the EP engine will be fired for only a little over 200 hours. The EP thrusters will be turned-off on 14 October at 13:42 UTC and the spacecraft will fly for one month, nominally without any orbit correction.

The relative position of the Moon and Earth will allow the gravitational field of the Earth to "hand-over" the probe to the Moon without intervention. The Flight Control team will carefully monitor the trajectory and only in case this is needed will perform necessary corrections. Community
Email This Article
Comment On This Article

Related Links
Smart-1 at ESA
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Stellar Chemistry, The Universe And All Within It



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Sloan Survey Identifies New Dwarf Galaxy Inside Milky Way
Washington DC (SPX) Jan 10, 2006
Astronomers using the Sloan Digital Sky Survey have discovered a previously unknown cluster of stars within the Milky Way that appears to be a separate dwarf galaxy being consumed by its much larger neighbor.







  • GE'S 1.5-Megawatt Wind Turbine First To Reach 2,500 Installations
  • MR3 Systems Completes First Recovery System At Hanford Nuclear Reservation
  • Fuel Cell Celebrates One Year
  • American Superconductor Achieves Full Power Of 5MW Ship Motor

  • Yucca Mountain Site Must Make Use Of Geological Safety Net
  • New Jersey Physicist Uncovers New Information About Plutonium
  • Complex Plant Design Goes Virtual To Save Time And Money
  • Volcanic Hazard At Yucca Mountain Greater Than Previously Thought





  • NASA Uses Remotely Piloted Airplane To Monitor Grapes



  • Pathfinder-Plus Solar Wing Readied to Fly Again at NASA Dryden
  • NASA To Award Contract For Aerospace Testing
  • Sonic Boom Modification May Lead To New Era
  • Hewitt Pledges Support For Aerospace Industry

  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program
  • Boeing-Led Team to Study Nuclear-Powered Space Systems

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement