Energy News  
Shuttle ET Repairs Continue

Atlantis sits inside the Vehicle Assembly Building, while repair work continues on the external tank. Photo credit: NASA/Jack Pfaller.
by Staff Writers
Cape Canaveral FL (SPX) Mar 16, 2007
Space Shuttle Atlantis is surrounded by service platforms in highbay 1 inside the Vehicle Assembly Building. Technicians continue repairs on the external tank from the hail damage caused by a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area in late February.

During the Flight Readiness Review, NASA's Space Shuttle Program managers unanimously decided to proceed with the STS-117 mission, pending the work to make necessary repairs to the damage.

A new target launch date has not been determined, but teams will focus on preparing Atlantis for liftoff in late April.

Mission STS-117 to the International Space Station will be scheduled sometime after a Russian Soyuz spacecraft returns from the station. The Soyuz is delivering new station crew members and returning others to Earth in late April. Adequate time is needed between the Soyuz undocking and the shuttle's arrival to the station.

During the 11-day mission, the six-member crew will install a new truss segment, retract a set of solar arrays and unfold a new set on the starboard side of the station. Lessons learned from two previous missions will provide the astronauts with new techniques and tools to perform their duties.

Atlantis Commander Rick Sturckow, Pilot Lee Archambault and Mission Specialists Jim Reilly, Patrick Forrester, Steven Swanson and John "Danny" Olivas will continue training at NASA's Johnson Space Center in Houston as they await a new target launch date.

The STS-117 flight crew will return to Kennedy Space Center a few days before launch.

Community
Email This Article
Comment On This Article

Related Links
STS-117 Mission
Space Shuttle News at Space-Travel.Com
Space Shuttle News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Repairs Underway Of Hail Damaged Shuttle External Tank
Cape Canaveral FL (SPX) Mar 11, 2007
On Sunday, Atlantis rolled from Launch Pad 39A to the Vehicle Assembly Building, where employees spent the week positioning platforms around the shuttle to allow for inspections and repairs to hail-damaged areas. Inspections of the external tank are expected to be completed next week. Some foam sanding has begun in the nose cone area of the tank.







  • New Lithium-Ion Battery Technology Created
  • Unlocking The Secrets Of High-Temperature Superconductors
  • China Bans New Small Coal-Based Power Generators
  • Progress Made in Biomass-to-Biofuels Conversion Process

  • US For Cooperation With Russia On Uranium Enrichment Centers
  • Chirac's Last EU Summit Goes Nuclear
  • Czech Nuclear Watchdog Head Says Temelin Leaks Unacceptable
  • Bushehr Nuclear Project Faces Uncertain Future

  • Disaster Zone Declared As Thai Haze Reaches Dangerous Levels
  • Thailand Considers Declaring Emergency Over Haze
  • Spacecraft To Study Clouds At Edge Of Space Arrives At Vandenberg
  • Metop Measures Ozone And Nitrogen Dioxide Concentrations With High Precision

  • Some Forests Recovering But Net Losses Persist
  • Indonesia To Rehabilitate Failed Peatland Project From Suharto Era
  • Forest Replacing Tundra At Rapid Rate
  • Malaysians In Buying Bid To Save Forests

  • Plant Size Morphs Dramatically as Scientists Tinker with Outer Layer
  • Indefinite Donor Accord To Preserve World Rice Varieties
  • Up To One Million Fish Found Dead In Thai River
  • Weeding Out The Risk Of Pest Plants

  • Toyota Anticipates Sharp Increase In Its Hybrid Sales
  • New Nanoscale Engineering Breakthrough Points To Hydrogen-Powered Vehicles
  • Geneva Show Hints At Green Fuel Jumble For Motorists
  • Students Enter Competition To Produce A Zero-Emissions Snowmobile

  • Germans Urged To Give Foreign Travel A Rest To Curb Global Warming
  • Raytheon Team Proposes Single International Standard In ADS-B Pursuit
  • NASA Signs Defense Department Agreement
  • Lockheed Martin And FAA Reach Significant Milestone In Transformation Of Flight Services

  • Could NASA Get To Pluto Faster? Space Expert Says Yes - By Thinking Nuclear
  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement