Energy News  
Shuttle Crew To Construct Space Railway At International Space Station

Stunning Desktop Available
  • 800X600     1024X768
  • 640x480     1280X1024

  • Cape Canaveral (AFP) Apr 3, 2002
    All systems but one appeared go late Tuesday for the launch Thursday of the space shuttle Atlantis, on an 11-day mission to the International Space Station, US space agency officials said.

    "Except for one issue, we are ready to go. That one issue is the external tank door power drive unit," said shuttle program manager Ron Dittemore.

    "I am very optimistic it is going to come out fine."

    A seven-member crew of astronauts and enough equipment to construct the first space railway will be aboard Atlantis when it launches Thursday afternoon from the Kennedy Space Center here.

    A 70-percent chance of favorable weather, combined with the shuttle's "excellent shape for the mission" means everything "is ready to go," Thursday said Jeff Spalding, NASA's flight test director.

    The crew is to spend the bulk of its mission assembling the Mobile Transporter, a rail system to carry the station's Canadian-built mechanical arm along a 91-meter (300-foot) truss when it is completed in 2004.

    Shuttle commander Michael Bloomfield, co-pilot Stephen Frick and mission specialists Rex Walheim, Ellen Ochoa, Lee Morin, Jerry Ross and Steven Smith, will transport and install the railcar and first truss segment of the Mobile Transporter during the mission, the 13th to the station.

    The structure -- the longest ever assembled in space -- will move the arm at a speed of just 91 meters (300 feet) per hour as the station travels around the Earth at 27,000 kilometers an hour (17,000 miles an hour).

    "This flight is every bit as complex and challenging as the Hubble maintenance flight completed a few weeks ago," Dittemore said. "It starts an ambitious year of station missions, delivering more than 50 tonnes of components by year's end, and begins a new phase of assembly destined to enhance what already is an unprecedented facility."

    Added NASA Mobile Transporter Subsystem manager Tom Farrell: "To build the rails that linked the east and west coasts of the United States, thousands of workers endured desert heat, frigid mountains and countless obstacles. These rails in space will run in temperatures far hotter than any desert and far colder than any mountain. And just like the transcontinental rails pulled together our country, these rails pull together 16 nations around the world, cooperating in orbit."

    Atlantis is scheduled to return April 15.

    Community
    Email This Article
    Comment On This Article

    Related Links
    SpaceDaily
    Search SpaceDaily
    Subscribe To SpaceDaily Express
    Space Station News at Space-Travel.Com



    Memory Foam Mattress Review
    Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
    XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


    NASA Had No Choice But To Buy Soyuz Flights
    Washington DC (SPX) Jan 09, 2006
    NASA's announcement last week that it will pay Roskosmos $43.6 million for a round-trip ride to the International Space Station this spring, and an equivalent figure for an as-yet-undetermined number of future flights to the station until 2012, represents the agency's acknowledgment that it had no alternative.







  • World-Class Energy Centre Launched
  • Beacon Power Installs Its Next Generation 6kWh Flywheel System At WinDBreak Cable
  • More Reliable Power Sought

  • Russia Receives Iranian Envoy, Faces Down Us Over Nuke Plant
  • UN To Spend "Tens Of Billions" On Chernobyl Recovery Plan
  • French Greens Miffed With Jospin Over Nuclear Energy
  • Russia Awash In Nuclear Leftovers









  • Boeing Signs Technology Development Agreement With JAI For Work On Sonic Cruiser
  • Boeing Sonic Cruiser Completes First Wind Tunnel Tests



  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement