Paris (ESA) Aug 17, 2004 SMART-1 is now into its 321st orbit, in good status and with all functions performing nominally. The current thrusting strategy is progressing well and one of the longest thrust arcs took place on 9 August at 22:14 for 56.7 hours. The next arc started on 14 August and will last for 39 hours. The thrust strategy has recently been re-optimised in order to take into account the actual engine performance. Long thrust arcs, alternating with short ones, will continue until Moon capture in mid November. Up to 10 August, and the 262nd engine pulse, the SMART-1 electric propulsion system has cumulated a total ON time of nearly 3000 hr, consumed about 47 kg of Xenon and imparted to the spacecraft a velocity increment of about 2213 ms-1.
Power The power system performance are good and as expected the power generated by the solar arrays continues to rise since aphelion (4 July), as shown in the graph below which shows the evolution of the power produced by the solar panel since launch.
Systems Update This period has been characterised by a change in the thermal environment caused by the EP thrusting strategy and the elongation of the orbit. Some units, like batteries and the star tracker optical heads, have registered high temperatures. This has caused a minor incident resulting in a reconfiguration to the redundant unit. The degradation of the transmitter A has slowed down considerably in the last two months, after a steady degradation for about three months. The cause of the degradation is still unknown and under investigation. Two Opto-coupler Single Event Upsets (resulting in an engine flame-out) occurred on 20 and 21 July. Some correlation could be identified with recent increased solar activity, although the upsets occurred about 1.5 days in advance. In both cases, the on-board software automatically restarted the engine. On 30 July, there were fluctuations in the Xenon supply thermothrottle current and several other thruster parameters. The cause of this behaviour is the closed loop control switching between two discrete operating conditions. This event was first reported in status report 21. In order to avoid such fluctuations, the EP nominal power setting was reduced from 1358.1W to 1285.3W. As a result, the subsequent thrust pattern has been re-optimised.
Science Update The first lunar resonance approach is planned on 19 August around 17:25 UT, when the spacecraft will be at 230 000 km geo apocentre and 197 492 km from the Moon. Some payload operations are planned including possible views of part of the far side of the Moon by AMIE (a European first).
Future Activities The next lunar resonances are scheduled for 13 September and 13 October. Lunar capture is planned for 15 November, and after EP spiralling down to polar lunar orbit with 300 km perilune and 3000 km apolune, we should start lunar commissioning and lunar science operations in mid-January 2005. The latest status and first results from SMART-1 were presented during the Lunar session and a dedicated press conference organised at COSPAR Paris on 22-23 July. In particular images obtained from the AMIE camera from Middle East and Mediterranean, as well as of Australia and Pacific were presented. The world space agencies recognised the precursor role of SMART-1 in a fleet of lunar orbiters and landers planned for the next 10 years.
Orbital/Trajectory information The osculating orbital elements are periodically computed by the ESOC specialists. These elements define the so-called "osculating orbit" which would be travelled by the spacecraft if at that instant all perturbations, including EP thrust, would cease. So it is an image of the situation at that epoch. In reality the path travelled by the spacecraft is a continuous spiral leading from one orbit to another. Community Email This Article Comment On This Article Related Links SMART-1 at ESA SpaceDaily Search SpaceDaily Subscribe To SpaceDaily Express Earth Observation News - Suppiliers, Technology and Application
![]() ![]() The importance of remotely sensed data and technologies to support natural disasters has prompted attention and action in Washington. New initiatives and legislation authorizing appropriations to the remote sensing industry will be discussed at Strategic Research Institute's U.S. Commercial Remote Sensing Industry conference, scheduled for February 9-10, 2006 in Washington D.C. |
![]() |
|
The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement |