Energy News  
Rascal Program Selects Phase Two Contractor

illustration only

Arlington - Mar 25, 2003
The Defense Advanced Research Projects Agency (DARPA) today selected Space Launch Corp., Irvine, Calif., to move into the 18-month second phase of the Responsive Access Small Cargo Affordable Launch (RASCAL) program.

The RASCAL program is developing and demonstrating low-cost space access for small payloads to low Earth orbit. The RASCAL system will consist of a first-stage reusable launch vehicle employing mass injection pre-compressor cooled turbojet engine technology and an upper expendable rocket vehicle designed with high mass fraction rocket stages.

In the second phase, Space Launch Corp. will design, develop and reduce the risk of critical technology.

Based on the results of phase two, DARPA will determine whether to continue on into phase three, fabrication, integration and flight-demonstration of two payloads in FY 2006.

The specific technical objectives of RASCAL include:

  • Mission turn-around time within 24 hours of payload arrival;
  • Delivery of a 75-kilogram payload into a 500-kilometer sun-synchronous orbit;
  • Recurring launch costs for the RASCAL operating system of $750,000 per launch for a 75-kilogram payload; and
  • The ability to operate from a 2,500-meter runway with minimal peculiar support equipment and independent of test ranges for telemetry and tracking support.

Community
Email This Article
Comment On This Article

Related Links
Defense Advanced Research Projects Agency
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Rocket Science News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Successful First Test For Vega's Zefiro 9 Engine
Paris, France(ESA) Dec 28, 2005
Flames, smoke and a deafening noise accompanied the first firing test of Vega's Zefiro 9 third-stage solid rocket motor. A first examination of the data indicates that everything went well at the test carried out yesterday at Salto de Quirra in southeast Sardinia.







  • White House Announces Plan To Build World's First Zero-Emissions Power Plant
  • Power Up With A Pack Of Cool Ones
  • Hydrogen Vehicle Won't Be Viable Soon, Study Says
  • Global Energy Research Alliance Formed

  • Volcanic Hazard At Yucca Mountain Greater Than Previously Thought
  • Los Alamos Lab Working On Romanian Nuke Waste Site
  • Glitch-Plagued Czech Nuclear Plant Suffers Problems, Again
  • Glitch-Plagued Czech Nuclear Reactor Suffers Another Shutdown









  • Aurora Builds Low-speed Wind Tunnel
  • Yeager To Retire From Military Flying After October Airshow
  • Boeing Signs Technology Development Agreement With JAI For Work On Sonic Cruiser
  • Boeing Sonic Cruiser Completes First Wind Tunnel Tests

  • New High-Purity Plutonium Sources Produced At Los Alamos

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement