Energy News  
Opportunity Passes 800 Sols On Mars

Image credit: NASA/JPL-Caltech/Cornell
by Staff Writers
Pasadena CA (SPX) May 1, 2006
Opportunity has passed 800 sols, or Martian days, of operations on the red planet, meaning the golf-cart-sized rover has functioned continuously nearly nine times longer than its initial mission design.

NASA controllers report that Opportunity remains in good working order and continues to roll toward a formation called Victoria Crater, with just under 1,400 meters (.86 mile) to go.

Controllers spent several days last week setting up for some robotic arm work over the weekend, with plans to continue the drive to Victoria this week.

Sol-by-sol summaries: Sol 796 (April 20): Opportunity ended a drive after 2 meters (about 7 feet). Imaging taken before and after the drive was completed.

Sol 797: The rover conducted untargeted remote science, including panoramic camera and miniature thermal emission spectrometer ground surveys and atmospheric measurements.

Sol 798: The rover completed targeted remote science, including panoramic camera images of rock and formation targets controllers have named Junction City, Chetopa, Coffeyville and Salina, and miniature thermal emission spectrometer stares of Junction City and Salina.

Sol 799: Opportunity traveled approximately 44 meters (144 feet).

Sol 800 (April 24): Opportunity drove 33.5 meters (110 feet), crossing a few small ripples and driving over an outcrop.

Sol 801: After taking a pre-drive image, Opportunity drove 28.3 meters (93 feet), down a couple of troughs and over a couple of ripples. Slip checks were used to prevent excessive driving in potentially slippery areas.

Sol 802: This sol's 13.8 meter (45 feet) drive was designed to move Opportunity closer to an outcrop the mission team wanted to analyze with the robotic arm.

Sol 803: The outcrop turned out to be fragmented, and therefore not a desirable target. So, controllers designed a short 8-meter (26 feet) drive to a better target.

As of Sol 802, Opportunity's odometry totaled 7,456.56 meters, or 4.63 miles.

Community
Email This Article
Comment On This Article

Related Links
Mars Rovers at JPL
Mars Rovers at Cornell
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


NASA Testing Prototype Software For Future Spaceflight
Moffett Field CA (SPX) Apr 28, 2006
Software that astronauts could use during spaceflight and in future moon habitats is being tested by NASA in a Utah desert April 23 to May 7, 2006. The research is taking place in Utah's southeast desert, at the Mars Society's Mars Desert Research Station near Hanksville, where scientists are field-testing a computer network to monitor space power systems.







  • Chinese Oil Safari Hits Nigeria
  • Milestone Achieved in the Development of Biological Fuel Cells
  • Work Starts On Controversial Siberian Pipeline
  • Renewables Still Struggling To Seize Big Share Of Energy Market

  • Defects Found In Reactor At Controversial Bulgarian Nuclear Plant
  • The Real Toll Of Chernobyl Remains Hidden In Background Noise
  • Russian Scientists Downplay Fallout From Chernobyl Disaster
  • Twenty Years On Effects From Chernobyl Disaster Go On

  • UNH And NASA Unlock The Puzzle Of Global Air Quality
  • Project Achieves Milestone In Analyzing Pollutants Dimming The Atmosphere
  • The 'Oxygen Imperative'
  • NASA Studies Air Pollution Flowing Into US From Abroad

  • Diverse Tropical Forests Defy Metabolic Ecology Models
  • Developing Nations May Save The Tropical Forest
  • Imported Dream Tree Becomes A Nightmare For Kenya
  • Monkey-Dung Offers Clues About Land-Use, Wildlife Ecology

  • Alternatives To The Use Of Nitrate As A Fertiliser
  • Researchers Trawl The Origins Of Sea Fishing In Northern Europe
  • Greens Happy As EU Tightens GMO Testing
  • Killing Wolves May Not Protect Livestock Efficiently

  • Prototype For Revolutionary One-Metre Wide Vehicle Is Developed
  • Highly Realistic Driving Simulator Helps Develop Safer Cars
  • Research On The Road To Intelligent Cars
  • Volvo Promises Hybrid Truck Engines Within Three Years

  • Test Pilot Crossfield Killed In Private Plane Crash
  • Aerospace Industry Slow To Embrace New MEMS Technologies
  • BAE Systems To Sell Airbus Stake, EADS Likely Buyers
  • DaimlerChrysler And Lagardere Cut Stake In EADS

  • Could NASA Get To Pluto Faster? Space Expert Says Yes - By Thinking Nuclear
  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement