Pasadena CA (JPL) Sep 08, 2005
Recovery from the sol 563 power-off event is well underway. Each sol, the team has planned one new activity. By sol 570 (Aug. 31, 2005), the rover had successfully performed observations with the panoramic camera, navigation camera, and miniature thermal emission spectrometer and had completed a short alpha particle X-ray spectrometer integration (with the robotic arm stowed) and a 6.5-meter (21-foot) blind drive.

Additional precautions are being taken with each sol's plan, including shutting down after the morning uplink (to save the high-gain antenna position, thus preventing an X-band fault in case of another anomaly) and waiting 15 minutes after wakeup to start any science activities.

Sol-by sol summaries

Sols 566 through 568 (Aug. 27 through Aug. 29, 2005) were devoted to engineering activities. Science activities were put on hold over the weekend while engineers investigated the sol 563 reset.

Sol 569: Spirit completed step two in the post-anomaly recovery plan: a short blind drive. (Step one, remote sensing with the panoramic camera and navigation camera, was performed on sol 565). The 6.5-meter (21-foot) drive executed perfectly, and all motor currents were nominal.

Sol 570: This sol marked the first use of the miniature thermal emission spectrometer since the sol 563 reset, which was step three in recovery from the anomaly. After waking from a nap and waiting 15 minutes, the rover performed a short alpha particle X-ray spectrometer integration with the robotic arm stowed.

This was simply to test the payload service board, which controls the spectrometers. Five minutes after the end of the alpha particle X-ray spectrometer test, a low-elevation raster was taken successfully with the miniature thermal emission spectrometer. The resulting data product has been received on Earth.

Sol 571: Spirit completed a blind drive of 11.8 meters (38.7 feet) designed to take it across some outcrop then over a small ripple.

Sols 572 and 573 (Sept. 2 and Sept. 3, 2005): Commands sent for these sols are for observations with the panoramic camera and navigation camera.

Opportunity's total distance driven on Mars, as of Sept. 2, 2005, is 5,755 meters (3.58 miles).

Community
Email This Article
Comment On This Article

Related Links
Mars Rovers at JPL
Mars Rovers at Cornell
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Spirit Heading To 'Home Plate'
Pasadena CA (JPL) Jan 09, 2006
Last week Spirit completed robotic-arm work on "El Dorado." The rover used all three of its spectrometers plus the microscopic imager for readings over the New Year's weekend.







  • US Oil Starts To Flow Week On From Katrina
  • GlobeTel Announces Letter Of Intent With Solar, Fuel Cell Research Consortium
  • Oil Prices Cool As US Energy Production Improves After Katrina
  • US Oil Industry Crawls Back To Life After Katrina

  • Death, Environmental Toll From Chernobyl Less Than Feared: Report
  • China Won't Sign On To PSI
  • China Issues White Paper On Arms Control
  • South China Province Picks Likely Site For Fourth Nuclear Plant

  • Getting To The TOPP Of Houston's Air Pollution
  • Scientists Seek Sprite Light Source



  • Novel Compounds Show Promise As Safer, More Potent Insecticides
  • Agriculture Reviving In Aceh After Tsunami: Scientists
  • Analysis: EU Farm Aid Under Spotlight
  • Global Warming To Boost Scots Farmers

  • SUV Drivers Beware: Paris Can Be A Deflating Experience
  • Mitsubishi, TEPCO To Team Up On Electric Car: Report
  • Intelligent System Offers Safer Tunnel Traffic For Europe
  • The Driving Doctor: Take Time To Observe

  • Electrical Power Flows Into First Lockheed Martin F-35
  • Boeing's F-15 Shoots Down French Rafale For Key Singapore Fighter Deal
  • EADS, Northrop Grumman Team Up To Bid For US Air Force Contract
  • Pakistan Air Force To Hold Big War Games

  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program
  • Boeing-Led Team to Study Nuclear-Powered Space Systems

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement